Cycle Time Study Calculator
Time each step several times with a stopwatch, type the readings in, and get the average, minimum, maximum, spread and selected time for every step. The tool names the bottleneck and gives you a study sheet to print or download.
Your study
One row per step or station. Type each stopwatch reading in seconds, with a space between readings.
Results by step
Want a second look at this result?
Leave your work email if you would like the OEE Lab team to get in touch about your numbers. To keep the result, use Copy link or Print above.
No newsletter, no spam.
A stopwatch study is one afternoon. The line runs every shift.
Fabrico, a light MES for OEE, takes stops, speed and counts live from PLCs or IoT sensors, with add-on AI cameras counting output where a machine has no usable signal, and shows OEE per line and shift. Operators tag the cause at the line.
Request a demo Contact usWhat a cycle time study gives you
A cycle time study is a set of repeated stopwatch readings, taken at the line, for each step of a job. It shows how long each step really takes and how much that time moves.
One reading tells you little. Ten readings tell you the normal time, the slow outliers and which step holds the line back.
If you only need one time per unit from a count and a clock, the cycle time calculator is quicker. This page is for the study itself.
How each time is worked out
The median is the middle reading, so one jam does not move it. That makes it a fair centre for deciding which readings to throw out.
You can switch the selected time to lowest repeatable. That is the lowest reading with a second reading within 5% of it, which shows what the step can do when nothing goes wrong.
Example: five steps, ten readings each
Example: an assembly line with five steps, ten readings each, a 15% outlier limit and a 48 second takt.
Fit and press reads 44, 46, 43, 45, 61, 44, 47, 43, 46 and 45. The median is 45, so the limit runs from 38.25 to 51.75 and the 61 goes out.
The other nine readings add up to 403, so the selected time is 403 ÷ 9 = 44.8 seconds. The plain average of all ten would say 46.4.
| Step | Avg | Min | Max | Spread | Selected |
|---|---|---|---|---|---|
| Load part | 31.7 | 30 | 34 | 4 | 31.7 |
| Fit and press | 46.4 | 43 | 61 | 18 | 44.8 |
| Fasten | 38.7 | 37 | 41 | 4 | 38.7 |
| Test | 51.3 | 49 | 54 | 5 | 51.3 |
| Pack | 28.3 | 27 | 30 | 3 | 28.3 |
Test has the longest selected time at 51.3 seconds, so it is the bottleneck. It sets a limit of 3,600 ÷ 51.3 = 70.2 units an hour and runs 3.3 seconds over takt.
Work content is the sum of the selected times: 194.8 seconds. Spread across five stations, that would average 39 seconds each, so there is room to move work off Test.
How to run the study on the floor
Write where each step starts and ends, such as hand touches the part, or part leaves the fixture.
Watch a few cycles without the stopwatch and tell the operator what you are doing and why.
Take at least 10 readings per step, as a starting point, and cover more than one operator where you can.
Circle any odd reading on the sheet and write the cause beside it.
Type the readings in while you still remember what the odd ones were.
Print the blank form above for the clipboard. Download the CSV if you want the study in Excel, where it opens as a normal sheet.
What the study is telling you
- Selected time over takt: that step cannot keep up, even with no stops. Move work away, add a parallel station or redesign the step.
- Wide spread: the method is not stable yet. Fix the cause of the slow readings before you try to speed up the step, and read more on cycle time variation.
- Big gap between steps: the line is unbalanced. The line balancing calculator puts a number on it.
- Selected time well under takt, yet the line misses its target: the loss is in stops and speed, not in the work. Check it with the OEE calculator.
Study mistakes to avoid
- Throwing out readings without a reason. The limit flags them, but a slow reading with a real cause, such as a part that often sticks, is a finding to fix.
- Timing only your best operator. You get a number the line cannot hold across shifts.
- Mixing in stops. A breakdown in the middle of a reading is downtime, and it belongs in the downtime log.
- Using the study as the ideal cycle for OEE without a check. A study shows what the line does today, and the ideal cycle should be the best rate it can hold. See how to calculate OEE performance.
- Adding station times to get the line cycle. Stations in a line work at once, so the slowest one sets the pace, not the sum.
Cycle time study questions
What is a cycle time study?
It is a set of repeated timed readings of each step of a job, taken at the line. It gives the normal time for each step, how much that time moves and which step is the bottleneck.
How many readings do I need in a cycle time study?
We suggest at least 10 per step as a starting point. Take more when the spread is wide, since a step that swings a lot needs more readings before its average settles.
What should a cycle time study format include?
The line, part, observer and date, then one row per step with its readings, average, minimum, maximum and selected time. The printable sheet on this page has that layout, filled in or blank.
Is there an Excel template for a cycle time study?
Use the Download CSV button, which opens in Excel with your steps, readings and results. For a blank paper version, print the blank form.
What is the difference between average and selected time?
The average uses every reading, jams included. The selected time leaves out readings beyond your limit around the median, so it shows the normal pace of the step.
Should the bottleneck be the same as the longest step?
In a line where each step has one station, yes, the step with the longest selected time sets the pace. If a step has two stations in parallel, divide its time by two before you compare, and check it against takt with the takt time calculator.