OEE Lab / TEEP Calculator

TEEP Calculator

Total Effective Equipment Performance = OEE × Utilization. It reveals the capacity you already own but don't use - often cheaper to recover than to buy. Updates as you type.

Your asset

TEEP measures against all 168 hours in a week.

%
Don't know it? Calculate OEE first.
h
Hours the asset is actually scheduled to run (max 168).
How TEEP works

TEEP = OEE × Utilization. Utilization = scheduled hours ÷ 168 (all calendar hours). Unlike OEE - which only judges scheduled time - TEEP also asks whether you're scheduling the asset enough to meet demand.

Total Effective Equipment Performance
-%
OEE × Utilization, against all calendar time
0full calendar capacity100
OEE
-
Utilization
-
Untapped
-
Idle (schedulable)
-

Get the capacity breakdown + benchmark report

We'll email a printable view of your TEEP and where the hidden capacity sits, plus the 2026 Manufacturing Benchmark Report. One email, no spam.

Done - check your inbox shortly.

No spam. Unsubscribe anytime.

Before you buy a machine, recover the one you have.

A low TEEP usually means capacity hiding in stops and speed loss - not a lack of machines. Fabrico raises real OEE by reading true causes from the line, so you get more out of the assets you already own.

See how Fabrico recovers capacity
OEE Lab is built and operated by Fabrico. Our tools stay free either way.

TEEP vs OEE

OEE tells you how well you run when you're scheduled to run. TEEP tells you how much of your total capacity - all 168 hours a week - you actually convert into good product. The difference is Utilization: are you even scheduling the asset?

That makes TEEP the right number for a capacity decision. A plant with 85% OEE but a 60% TEEP is leaving a third of its calendar capacity on the table - capacity it could sell, often without a euro of capex.

Why is TEEP lower than OEE?

Because it counts all calendar time, including nights and weekends you may not schedule. That's intentional - it surfaces idle capacity OEE ignores.

Should I aim for 100% TEEP?

Rarely - running 24/7 isn't always desirable. Use TEEP to decide whether unmet demand should be filled by more scheduling/uptime before buying equipment.

How do I raise TEEP?

Two levers: raise OEE (cut stops and speed loss - see the hidden factory) and raise Utilization (schedule more, if demand justifies it).

← All OEE Lab tools · Buyer's guide: choosing OEE & CMMS software