OEE Report Template
Enter one period's numbers for a line: a shift, a week or a month. You get a finished OEE report with availability, performance, quality, OEE, the losses in minutes and the biggest loss, ready to print or paste into an email. Nothing is sent anywhere.
The period's numbers
Add up all shifts in the period first. Use minutes for time and seconds for the ideal cycle.
Want help with your OEE numbers?
Leave your work email if you would like the OEE Lab team to get in touch. To keep the report, use Print or Copy above.
No newsletter, no spam.
The slow part of this report is collecting the numbers.
Fabrico, a light MES for OEE, takes stops, speed and counts live from PLCs or IoT sensors, with add-on AI cameras counting output where a machine has no usable signal, and shows OEE per line and shift. Operators tag the cause at the line.
Request a demo Contact usWhat this OEE report does
An OEE report tells the reader the number, what is behind it and what to do next. It fits on one page, so people actually read it.
This template is for the end of a period, such as a monthly OEE report. To collect the numbers shift by shift, use the OEE tracking template and bring the totals here.
The OEE report format
The report above runs in this order: header, the four OEE figures, the biggest loss, how each factor was worked out, where the planned time went, and an action with an owner.
The losses are in minutes on purpose. Minutes add up and compare across factors, and percentages do not.
The OEE formulas in the report
This follows the method in Overall Equipment Effectiveness (R. C. Hansen, 2001). For the detail on one factor, the OEE calculator and this guide to the three factors go deeper.
A monthly OEE report example
Example: a packing line planned for 18,900 minutes in a month, with 1,890 minutes of stops, an ideal cycle of 6 seconds, 140,000 units made and 135,800 good.
| Factor | Calculation | Result |
|---|---|---|
| Availability | 17,010 ÷ 18,900 | 90.0% |
| Performance | 14,000 ÷ 17,010 | 82.3% |
| Quality | 135,800 ÷ 140,000 | 97.0% |
| OEE | 0.900 × 0.823 × 0.970 | 71.9% |
You can check it from the other side. 135,800 good units at 6 seconds is 13,580 fully productive minutes, and 13,580 ÷ 18,900 = 71.9%.
Against last period's 70.2%, the line is up 1.7 points, and it sits 3.1 points under the 75% target. Both of those figures are made up for this example, so use your own.
Reading the biggest loss
- Speed and short stops on top: first check the ideal cycle, then tally short stops by cause. The guide to micro-stops shows how.
- Stops on top: the stop list tells you where to go. The machine downtime report template ranks them by reason.
- Rejects on top: split startup rejects from running rejects, since they have different causes.
- Performance over 100%: the ideal cycle is set too slow or the count is wrong. The tool flags it, and OEE over 100% explains why.
To judge the number itself, compare a line with its own past periods first. If someone asks about 85%, that is the figure usually traced to Seiichi Nakajima's Introduction to TPM (1988), and setting OEE targets covers how to use it.
Errors that creep into monthly reports
- Averaging shift or machine percentages. Add the minutes and counts for the period, then divide, as averaging OEE across machines shows.
- Leaving changeovers out of stops. They are planned, but they count against availability.
- Counting rework as good. Quality counts only what was right the first time.
- Changing the rules between reports. A new ideal cycle or a new view of planned time can move OEE with no change on the floor. Note any change on the report.
- One cycle for many products. If products run at different speeds, work out the ideal time per product, add them, and enter the total × 60 ÷ total count as the cycle.
OEE report questions
What should an OEE report include?
The line and period, availability, performance, quality and OEE, the losses in minutes, the biggest loss and one action with an owner. Add last period's figure so the reader sees the direction.
How do you make a monthly OEE report?
Add up planned time, stops, ideal time, total count and good count for all shifts in the month, then work out the factors from those totals. Do not average the daily percentages, because a short shift would count as much as a full one.
Can I report OEE for several machines on one report?
Yes, if you weight by planned time. Add each machine's good output minutes, add the planned minutes and divide, as in how to average OEE across machines.
What is the biggest loss on an OEE report?
It is the loss category with the most minutes in the period: breakdowns, changeovers, other stops, speed and short stops, or rejects. All five are in the same unit, so they can be ranked directly.
Who should get the OEE report?
Send a line report to the supervisor and the people who can act on the top loss, and a roll-up to plant management. Keep the same rules on both, so the numbers tie up.