EasyProblem 1: Three factors

A machine runs at 88% availability, 92% performance and 98% quality. What is its OEE?

%
Show the full working
StepCalculationResult
OEE0.88 × 0.92 × 0.9879.3%

Answer: 79.3%.

OEE is always lower than its lowest factor, unless the other two are both 100%.

EasyProblem 2: Availability

A line is planned for 450 minutes. It stops for 63 minutes in total. What is its availability?

%
Show the full working
StepCalculationResult
Run time450 - 63387 min
Availability387 ÷ 45086.0%

Answer: 86.0%.

EasyProblem 3: Quality

A press makes 5,200 parts. 156 of them are rejects. What is its quality rate?

%
Show the full working
StepCalculationResult
Good count5,200 - 1565,044
Quality5,044 ÷ 5,20097.0%

Answer: 97.0%.

EasyProblem 4: Performance

A machine ran for 400 minutes and made 4,200 units. Its ideal cycle time is 5 seconds. What is its performance?

%
Show the full working
StepCalculationResult
Ideal time4,200 × 5 ÷ 60350 min
Performance350 ÷ 40087.5%

Answer: 87.5%.

Performance compares the time the units should have taken with the time the machine ran.

MediumProblem 5: A full shift

An 8 hour shift has a 30 minute lunch, with the line stopped and not scheduled. The line has 45 minutes of breakdowns. The ideal cycle is 3 seconds. It makes 6,900 units, of which 150 are rejects. What is the OEE?

%
Show the full working
StepCalculationResult
Planned time480 - 30450 min
Run time450 - 45405 min
Availability405 ÷ 45090.0%
Ideal time6,900 × 3 ÷ 60345 min
Performance345 ÷ 40585.2%
Quality6,750 ÷ 6,90097.8%
OEE0.900 × 0.852 × 0.97875.0%

Answer: 75.0%.

Check: 6,750 good units × 3 s = 337.5 minutes, and 337.5 ÷ 450 = 75.0%.

MediumProblem 6: A rate, not a cycle

A filler's ideal rate is 1,200 units an hour. It is planned for 420 minutes and stops for 70. It makes 5,600 units, and 5,488 are good. What is the OEE?

%
Show the full working
StepCalculationResult
Run time420 - 70350 min
Availability350 ÷ 42083.3%
Ideal time5,600 ÷ 20280 min
Performance280 ÷ 35080.0%
Quality5,488 ÷ 5,60098.0%
OEE0.833 × 0.800 × 0.98065.3%

Answer: 65.3%.

MediumProblem 7: Breaks and changeovers

An 8 hour shift has two 15 minute breaks and a 30 minute lunch, none of them scheduled to run. The line also has a 35 minute changeover and 25 minutes of breakdowns. What is its availability?

%
Show the full working
StepCalculationResult
Planned time480 - 15 - 15 - 30420 min
Stops35 + 2560 min
Run time420 - 60360 min
Availability360 ÷ 42085.7%

Answer: 85.7%.

The trap: a changeover is planned, but the machine was meant to run, so it lowers availability.

MediumProblem 8: Rework

A cell makes 8,000 units. 240 are scrapped. Another 160 fail first time, get reworked and ship as good. What is the quality rate for OEE?

%
Show the full working
StepCalculationResult
Right first time8,000 - 240 - 1607,600
Quality7,600 ÷ 8,00095.0%

Answer: 95.0%.

The trap: counting the 160 reworked units as good would give 97.0%.

MediumProblem 9: Minutes lost to speed

A line is planned for 480 minutes and stops for 48. The ideal cycle is 4 seconds and it makes 5,400 units. How many minutes are lost to slow running and short stops?

min
Show the full working
StepCalculationResult
Run time480 - 48432 min
Ideal time5,400 × 4 ÷ 60360 min
Speed loss432 - 36072 min

Answer: 72 min.

That is more than the 48 minutes of logged stops, which is why speed loss deserves a look.

HardProblem 10: Work backward

Your target is 80% OEE. Availability is 90% and quality is 98%. What performance do you need to hit the target?

%
Show the full working
StepCalculationResult
A × Q0.90 × 0.980.882
Performance needed0.80 ÷ 0.88290.7%

Answer: 90.7%.

HardProblem 11: Two products in one shift

A machine is planned for 480 minutes and stops for 60. It makes 6,000 of product A at an ideal 2 seconds, with 5,880 good. Then it makes 3,000 of product B at an ideal 3 seconds, with 2,940 good. What is the OEE?

%
Show the full working
StepCalculationResult
Good time, A5,880 × 2 ÷ 60196 min
Good time, B2,940 × 3 ÷ 60147 min
Good time, total196 + 147343 min
OEE343 ÷ 48071.5%

Answer: 71.5%.

Counts of different products cannot be added against one cycle. Minutes can.

HardProblem 12: Combining two lines

Line X ran 480 planned minutes at 70% OEE. Line Y ran 240 planned minutes at 40% OEE. What is their combined OEE?

%
Show the full working
StepCalculationResult
Good time, X480 × 0.70336 min
Good time, Y240 × 0.4096 min
Combined(336 + 96) ÷ (480 + 240)60.0%

Answer: 60.0%.

The trap: the simple average is 55%, which gives the short run as much say as the long one.

HardProblem 13: The OEE that demand needs

A customer needs 1,000 good units from a 450 minute planned shift. The ideal cycle is 22 seconds. What is the lowest OEE that meets the demand?

%
Show the full working
StepCalculationResult
Good time needed1,000 × 22 ÷ 60366.7 min
OEE needed366.7 ÷ 45081.5%

Answer: 81.5%.

This links OEE to takt. Takt here is 27 seconds, and 22 ÷ 27 gives the same 81.5%.

0 of 13 correct

Teaching OEE to your team?

Leave your work email if you would like the OEE Lab team to get in touch about OEE on your lines.

Thanks, we have your email.

No newsletter, no spam.

Practice problems have clean numbers. Real lines do not.

On the floor, the hard part is getting true stops, speed and counts. Fabrico, a light MES for OEE, takes them live from PLCs or IoT sensors, with add-on AI cameras counting output where a machine has no usable signal, operators tag the cause at the line, and OEE shows per line and shift.

See where your line loses this time: book a demo with a Fabrico consultant.

Request a demo Contact us
Our tools stay free either way.

The method behind every answer

Every problem here uses the standard OEE method from Overall Equipment Effectiveness (R. C. Hansen, 2001): availability × performance × quality. Each factor has one job, and each one loses time in a different way.

Availability = run time ÷ planned time
Performance = ideal time ÷ run time
Quality = good count ÷ total count
OEE = Availability × Performance × Quality
Ideal time is count × ideal cycle. Keep all time in the same unit.

There is a shortcut for checking your work. OEE also equals good units × ideal cycle ÷ planned time, so you can get the same answer from one line.

A sample OEE calculation, step by step

Problem 5 above has the shape most OEE exercises take, so here it is slowly. Example: an 8 hour shift, a 30 minute lunch, 45 minutes of breakdowns, a 3 second ideal cycle, 6,900 units and 150 rejects.

First, set planned time. Lunch is not scheduled to run, so planned time is 480 - 30 = 450 minutes.

Next, availability. Run time is 450 - 45 = 405 minutes, and 405 ÷ 450 = 90.0%.

Then performance. The 6,900 units should take 6,900 × 3 ÷ 60 = 345 minutes, and 345 ÷ 405 = 85.2%.

Then quality. Good units are 6,900 - 150 = 6,750, and 6,750 ÷ 6,900 = 97.8%.

Planned time450 min
Run time, after stops405 min
Ideal time, after speed loss345 min
Good output time, after rejects337.5 min
Each factor takes a slice off the planned time. What remains, 337.5 of 450 minutes, is the OEE: 75.0%.

The traps these problems test

  • Breaks in the wrong place. Time not scheduled to run comes out of planned time. See how to count breaks in OEE.
  • Changeovers left out. They are planned, but the machine was meant to run, so they are stops. See how to count changeovers in OEE.
  • Rework counted as good. Quality is first pass only, as how to calculate OEE quality explains.
  • Mixed units. A cycle in seconds against a run time in minutes is an easy slip. Convert before you divide.
  • A rate treated as a cycle. 1,200 an hour is 3 seconds per unit, or 20 units a minute.
  • Averaged percentages. Combine periods and machines through minutes, as in how to average OEE across machines.

More slips like these, from real spreadsheets rather than exams, are in OEE calculation mistakes.

How to use these OEE exercises

1
Work it on paper
Write each step before you type an answer. The steps matter more than the final number.
2
Check your answer
Type it to one decimal. A wrong answer gets a hint, and you can try again.
3
Read the working
Open it even when you are right, since it often shows a quicker check or a trap.
4
Try your own line
Put last week's real numbers into the OEE calculator and see which loss is biggest.
The same steps work for self-study or for a team session.

To train a team, press Print worksheet for a clean page with no answers, and keep this page open for the workings. The guide to OEE training for operators covers how to run the session.

How to read your score

Getting problems 1 to 4 right means you know the formulas. Problems 5 to 9 test whether you sort real shift data into the right places.

Problems 10 to 13 test whether you can use OEE to answer planning questions. Those are the ones that come up in a real plant.

When you are ready, the OEE calculator does the sums for your own numbers.

OEE practice questions

How do you calculate OEE with an example?

Multiply availability, performance and quality. A line at 90.0% availability, 85.2% performance and 97.8% quality has an OEE of 75.0%, which is problem 5 on this page.

What is a good way to practice OEE calculations?

Work each problem on paper, then check your answer and read the working. Start with the single factor problems, since the full problems only combine them.

Do planned breaks count in an OEE calculation?

Not if the line is not scheduled to run during them, because they come out of planned production time. Changeovers do count, since the machine was meant to be running.

Why does my OEE answer differ by a small amount?

Rounding the factors before you multiply can move the answer by a tenth or so. Keep full values until the last step, and this page accepts answers within 0.2 points.

What are typical OEE exam or interview questions?

Most come down to a few shapes: work out OEE from shift data, find one missing factor, and say which loss is biggest. Problems 5, 9 and 10 on this page cover those shapes.