EasyProblem 1: Three factors
A machine runs at 88% availability, 92% performance and 98% quality. What is its OEE?
%
Show the full working
Step
Calculation
Result
OEE
0.88 × 0.92 × 0.98
79.3%
Answer: 79.3%.
OEE is always lower than its lowest factor, unless the other two are both 100%.
EasyProblem 2: Availability
A line is planned for 450 minutes. It stops for 63 minutes in total. What is its availability?
%
Show the full working
Step
Calculation
Result
Run time
450 - 63
387 min
Availability
387 ÷ 450
86.0%
Answer: 86.0%.
EasyProblem 3: Quality
A press makes 5,200 parts. 156 of them are rejects. What is its quality rate?
%
Show the full working
Step
Calculation
Result
Good count
5,200 - 156
5,044
Quality
5,044 ÷ 5,200
97.0%
Answer: 97.0%.
EasyProblem 4: Performance
A machine ran for 400 minutes and made 4,200 units. Its ideal cycle time is 5 seconds. What is its performance?
%
Show the full working
Step
Calculation
Result
Ideal time
4,200 × 5 ÷ 60
350 min
Performance
350 ÷ 400
87.5%
Answer: 87.5%.
Performance compares the time the units should have taken with the time the machine ran.
MediumProblem 5: A full shift
An 8 hour shift has a 30 minute lunch, with the line stopped and not scheduled. The line has 45 minutes of breakdowns. The ideal cycle is 3 seconds. It makes 6,900 units, of which 150 are rejects. What is the OEE?
%
Show the full working
Step
Calculation
Result
Planned time
480 - 30
450 min
Run time
450 - 45
405 min
Availability
405 ÷ 450
90.0%
Ideal time
6,900 × 3 ÷ 60
345 min
Performance
345 ÷ 405
85.2%
Quality
6,750 ÷ 6,900
97.8%
OEE
0.900 × 0.852 × 0.978
75.0%
Answer: 75.0%.
Check: 6,750 good units × 3 s = 337.5 minutes, and 337.5 ÷ 450 = 75.0%.
MediumProblem 6: A rate, not a cycle
A filler's ideal rate is 1,200 units an hour. It is planned for 420 minutes and stops for 70. It makes 5,600 units, and 5,488 are good. What is the OEE?
%
Show the full working
Step
Calculation
Result
Run time
420 - 70
350 min
Availability
350 ÷ 420
83.3%
Ideal time
5,600 ÷ 20
280 min
Performance
280 ÷ 350
80.0%
Quality
5,488 ÷ 5,600
98.0%
OEE
0.833 × 0.800 × 0.980
65.3%
Answer: 65.3%.
MediumProblem 7: Breaks and changeovers
An 8 hour shift has two 15 minute breaks and a 30 minute lunch, none of them scheduled to run. The line also has a 35 minute changeover and 25 minutes of breakdowns. What is its availability?
%
Show the full working
Step
Calculation
Result
Planned time
480 - 15 - 15 - 30
420 min
Stops
35 + 25
60 min
Run time
420 - 60
360 min
Availability
360 ÷ 420
85.7%
Answer: 85.7%.
The trap: a changeover is planned, but the machine was meant to run, so it lowers availability.
MediumProblem 8: Rework
A cell makes 8,000 units. 240 are scrapped. Another 160 fail first time, get reworked and ship as good. What is the quality rate for OEE?
%
Show the full working
Step
Calculation
Result
Right first time
8,000 - 240 - 160
7,600
Quality
7,600 ÷ 8,000
95.0%
Answer: 95.0%.
The trap: counting the 160 reworked units as good would give 97.0%.
MediumProblem 9: Minutes lost to speed
A line is planned for 480 minutes and stops for 48. The ideal cycle is 4 seconds and it makes 5,400 units. How many minutes are lost to slow running and short stops?
min
Show the full working
Step
Calculation
Result
Run time
480 - 48
432 min
Ideal time
5,400 × 4 ÷ 60
360 min
Speed loss
432 - 360
72 min
Answer: 72 min.
That is more than the 48 minutes of logged stops, which is why speed loss deserves a look.
HardProblem 10: Work backward
Your target is 80% OEE. Availability is 90% and quality is 98%. What performance do you need to hit the target?
%
Show the full working
Step
Calculation
Result
A × Q
0.90 × 0.98
0.882
Performance needed
0.80 ÷ 0.882
90.7%
Answer: 90.7%.
HardProblem 11: Two products in one shift
A machine is planned for 480 minutes and stops for 60. It makes 6,000 of product A at an ideal 2 seconds, with 5,880 good. Then it makes 3,000 of product B at an ideal 3 seconds, with 2,940 good. What is the OEE?
%
Show the full working
Step
Calculation
Result
Good time, A
5,880 × 2 ÷ 60
196 min
Good time, B
2,940 × 3 ÷ 60
147 min
Good time, total
196 + 147
343 min
OEE
343 ÷ 480
71.5%
Answer: 71.5%.
Counts of different products cannot be added against one cycle. Minutes can.
HardProblem 12: Combining two lines
Line X ran 480 planned minutes at 70% OEE. Line Y ran 240 planned minutes at 40% OEE. What is their combined OEE?
%
Show the full working
Step
Calculation
Result
Good time, X
480 × 0.70
336 min
Good time, Y
240 × 0.40
96 min
Combined
(336 + 96) ÷ (480 + 240)
60.0%
Answer: 60.0%.
The trap: the simple average is 55%, which gives the short run as much say as the long one.
HardProblem 13: The OEE that demand needs
A customer needs 1,000 good units from a 450 minute planned shift. The ideal cycle is 22 seconds. What is the lowest OEE that meets the demand?
%
Show the full working
Step
Calculation
Result
Good time needed
1,000 × 22 ÷ 60
366.7 min
OEE needed
366.7 ÷ 450
81.5%
Answer: 81.5%.
This links OEE to takt. Takt here is 27 seconds, and 22 ÷ 27 gives the same 81.5%.
0 of 13 correct
Teaching OEE to your team?
Leave your work email if you would like the OEE Lab team to get in touch about OEE on your lines.
Thanks, we have your email.
No newsletter, no spam.
Practice problems have clean numbers. Real lines do not.
On the floor, the hard part is getting true stops, speed and counts. Fabrico, a light MES for OEE, takes them live from PLCs or IoT sensors, with add-on AI cameras counting output where a machine has no usable signal, operators tag the cause at the line, and OEE shows per line and shift.
See where your line loses this time: book a demo with a Fabrico consultant.
Every problem here uses the standard OEE method from Overall Equipment Effectiveness (R. C. Hansen, 2001): availability × performance × quality. Each factor has one job, and each one loses time in a different way.
Availability = run time ÷ planned time
Performance = ideal time ÷ run time
Quality = good count ÷ total count
OEE = Availability × Performance × Quality
Ideal time is count × ideal cycle. Keep all time in the same unit.
There is a shortcut for checking your work. OEE also equals good units × ideal cycle ÷ planned time, so you can get the same answer from one line.
A sample OEE calculation, step by step
Problem 5 above has the shape most OEE exercises take, so here it is slowly. Example: an 8 hour shift, a 30 minute lunch, 45 minutes of breakdowns, a 3 second ideal cycle, 6,900 units and 150 rejects.
First, set planned time. Lunch is not scheduled to run, so planned time is 480 - 30 = 450 minutes.
Next, availability. Run time is 450 - 45 = 405 minutes, and 405 ÷ 450 = 90.0%.
Then performance. The 6,900 units should take 6,900 × 3 ÷ 60 = 345 minutes, and 345 ÷ 405 = 85.2%.
Then quality. Good units are 6,900 - 150 = 6,750, and 6,750 ÷ 6,900 = 97.8%.
Planned time450 min
Run time, after stops405 min
Ideal time, after speed loss345 min
Good output time, after rejects337.5 min
Each factor takes a slice off the planned time. What remains, 337.5 of 450 minutes, is the OEE: 75.0%.
The traps these problems test
Breaks in the wrong place. Time not scheduled to run comes out of planned time. See how to count breaks in OEE.
Changeovers left out. They are planned, but the machine was meant to run, so they are stops. See how to count changeovers in OEE.
More slips like these, from real spreadsheets rather than exams, are in OEE calculation mistakes.
How to use these OEE exercises
1
Work it on paper Write each step before you type an answer. The steps matter more than the final number.
2
Check your answer Type it to one decimal. A wrong answer gets a hint, and you can try again.
3
Read the working Open it even when you are right, since it often shows a quicker check or a trap.
4
Try your own line Put last week's real numbers into the OEE calculator and see which loss is biggest.
The same steps work for self-study or for a team session.
To train a team, press Print worksheet for a clean page with no answers, and keep this page open for the workings. The guide to OEE training for operators covers how to run the session.
How to read your score
Getting problems 1 to 4 right means you know the formulas. Problems 5 to 9 test whether you sort real shift data into the right places.
Problems 10 to 13 test whether you can use OEE to answer planning questions. Those are the ones that come up in a real plant.
When you are ready, the OEE calculator does the sums for your own numbers.
OEE practice questions
How do you calculate OEE with an example?
Multiply availability, performance and quality. A line at 90.0% availability, 85.2% performance and 97.8% quality has an OEE of 75.0%, which is problem 5 on this page.
What is a good way to practice OEE calculations?
Work each problem on paper, then check your answer and read the working. Start with the single factor problems, since the full problems only combine them.
Do planned breaks count in an OEE calculation?
Not if the line is not scheduled to run during them, because they come out of planned production time. Changeovers do count, since the machine was meant to be running.
Why does my OEE answer differ by a small amount?
Rounding the factors before you multiply can move the answer by a tenth or so. Keep full values until the last step, and this page accepts answers within 0.2 points.
What are typical OEE exam or interview questions?
Most come down to a few shapes: work out OEE from shift data, find one missing factor, and say which loss is biggest. Problems 5, 9 and 10 on this page cover those shapes.