Your lines or machines
One period for all of them. Use the same unit within a row: rate per hour, counts in that unit.
Line by line
Want a second look at this result?
Leave your work email if you would like the OEE Lab team to get in touch about your numbers. To keep the result, use Copy link or Print above.
No newsletter, no spam.
A plant number is only as good as the counts behind it.
Fabrico, a light MES for OEE, shows OEE per line and shift from stops, speed and counts taken live from PLCs or IoT sensors, with add-on AI cameras counting output where a machine has no usable signal. It is built in the EU, with EU data residency. See it live in Fabrico.
Request a demo Contact usOne OEE figure for several lines
It gives one OEE for a plant, an area or a group of machines, weighted by the time each one was planned to run. It puts the simple average next to it, so you can see how far off that shortcut is.
For the reasoning, more cases and a spreadsheet formula, read how to average OEE across machines. This page does the sum on your own lines.
How to calculate plant OEE
This is the same as weighting each line's OEE by its planned time, the roll-up rule in Overall Equipment Effectiveness (R. C. Hansen, 2001). The per-line step is the good-count form of Availability × Performance × Quality, explained in availability, performance and quality.
Example: three lines in one week
These are made-up numbers. Line C ran a short trial of 20 hours, while A and B ran most of the schedule.
| Line | Planned h | Ideal / h | Good | Good output h | OEE |
|---|---|---|---|---|---|
| Line A | 120 | 900 | 86,400 | 96 | 80.0% |
| Line B | 80 | 600 | 28,800 | 48 | 60.0% |
| Line C | 20 | 300 | 2,100 | 7 | 35.0% |
| Plant | 220 | 151 | 68.6% |
The simple average is (80 + 60 + 35) / 3 = 58.3%, which is 10.3 points below the true figure.
Why the two numbers differ
A simple average gives every line one vote. Line C has 9% of the planned hours and 33% of the vote, so its 35% result drags the figure down.
The gap can go either way. If your largest line is your worst, the simple average reads too high and hides a real problem.
Where to look after the plant number
Do not stop at the plant number, because it mixes very different problems. Look at lost hours, line by line, in the table under the calculator.
Hours tell you where to start when the lines matter equally. If one is the bottleneck, start there, because the bottleneck sets what the plant ships.
The tool shows "uptime and speed" and quality per line, because it has no run time to split the two. To split them on one line, use the OEE calculator.
Roll-up errors to avoid
- Pooling units. Total good / total ideal units gives 72.4% here, because fast lines swamp slow ones. Add hours, never units.
- Averaging the three factors, then multiplying. The product of averages is not the average of products, as the averaging guide shows.
- Adding machines in series. Machines feeding each other are one line, so measure at its output against the bottleneck rate. See line OEE vs machine OEE.
- Mixing rules. Planned time must mean the same thing on every row. Otherwise the weights are not comparable.
- Counting a line with no data as 0%. Leave it out and say so. The calculator leaves out incomplete rows and names them.
Overall OEE questions
How do you calculate plant OEE?
Work out good output hours for each line, which is good count divided by ideal rate. Add them up and divide by total planned hours. In the example, 151 / 220 = 68.6%.
How do you calculate OEE for multiple machines?
If they run side by side, weight each machine's OEE by its planned time, as this tool does. If they feed each other, treat them as one line and measure at the end. For one step with several machines, see OEE for parallel machines.
How do you calculate overall OEE from three percentages?
You need the planned time behind each one. Multiply each OEE by its planned time, add the results and divide by total planned time. Without the times, you can only get a simple average, which may be off by many points.
Can I use the simple average if all lines run the same hours?
Yes. With equal planned time, the weighted result and the simple average are the same. The tool shows a gap of 0 in that case.
Why does my line show over 100%?
The ideal rate is too low, or the count includes another period. OEE cannot pass 100% with a true ideal rate. See OEE over 100 percent.
What is a good plant OEE?
Targets are set per process, and a plant figure mixes many of them, so compare each line with its own trend. How to set OEE targets walks through the method.