OEE Lab / Tools / Plant OEE Calculator

Plant OEE Calculator

Add each line or machine with its planned time, ideal rate and counts. You get the time-weighted plant OEE next to the simple average, and why the two differ.

Your lines or machines

One period for all of them. Use the same unit within a row: rate per hour, counts in that unit.

Plant OEE, weighted by planned time
-%
Good output hours / planned hours, all lines
0%100%
Simple average
-
Gap, in points
-
Planned hours
-
Good output hours
-
Lost hours
-
Biggest loss
-

Line by line

Want a second look at this result?

Leave your work email if you would like the OEE Lab team to get in touch about your numbers. To keep the result, use Copy link or Print above.

Thanks, we have your email.

No newsletter, no spam.

A plant number is only as good as the counts behind it.

Fabrico, a light MES for OEE, shows OEE per line and shift from stops, speed and counts taken live from PLCs or IoT sensors, with add-on AI cameras counting output where a machine has no usable signal. It is built in the EU, with EU data residency. See it live in Fabrico.

See where your line loses this time: book a demo with a Fabrico consultant.

Request a demo Contact us
Our tools stay free either way.

One OEE figure for several lines

It gives one OEE for a plant, an area or a group of machines, weighted by the time each one was planned to run. It puts the simple average next to it, so you can see how far off that shortcut is.

For the reasoning, more cases and a spreadsheet formula, read how to average OEE across machines. This page does the sum on your own lines.

How to calculate plant OEE

Good output hours = good count / ideal rate per hour
Line OEE = good output hours / planned hours
Plant OEE = Σ good output hours / Σ planned hours
Good output hours can be added across lines, even when the lines make different things.

This is the same as weighting each line's OEE by its planned time, the roll-up rule in Overall Equipment Effectiveness (R. C. Hansen, 2001). The per-line step is the good-count form of Availability × Performance × Quality, explained in availability, performance and quality.

Example: three lines in one week

These are made-up numbers. Line C ran a short trial of 20 hours, while A and B ran most of the schedule.

LinePlanned hIdeal / hGoodGood output hOEE
Line A12090086,4009680.0%
Line B8060028,8004860.0%
Line C203002,100735.0%
Plant22015168.6%
Good output hours add up to 151 of 220 planned hours, so plant OEE is 68.6%.

The simple average is (80 + 60 + 35) / 3 = 58.3%, which is 10.3 points below the true figure.

Why the two numbers differ

A simple average gives every line one vote. Line C has 9% of the planned hours and 33% of the vote, so its 35% result drags the figure down.

Weighted by planned time68.6%
Simple average of the three lines58.3%
Same three lines, two answers. Only the weighted one matches the good output hours the plant really made.

The gap can go either way. If your largest line is your worst, the simple average reads too high and hides a real problem.

Where to look after the plant number

Do not stop at the plant number, because it mixes very different problems. Look at lost hours, line by line, in the table under the calculator.

Line B, OEE 60%32 h lost
Line A, OEE 80%24 h lost
Line C, OEE 35%13 h lost
Line C has the worst OEE, but Line B has the most hours to win back.

Hours tell you where to start when the lines matter equally. If one is the bottleneck, start there, because the bottleneck sets what the plant ships.

The tool shows "uptime and speed" and quality per line, because it has no run time to split the two. To split them on one line, use the OEE calculator.

Roll-up errors to avoid

  • Pooling units. Total good / total ideal units gives 72.4% here, because fast lines swamp slow ones. Add hours, never units.
  • Averaging the three factors, then multiplying. The product of averages is not the average of products, as the averaging guide shows.
  • Adding machines in series. Machines feeding each other are one line, so measure at its output against the bottleneck rate. See line OEE vs machine OEE.
  • Mixing rules. Planned time must mean the same thing on every row. Otherwise the weights are not comparable.
  • Counting a line with no data as 0%. Leave it out and say so. The calculator leaves out incomplete rows and names them.

Overall OEE questions

How do you calculate plant OEE?

Work out good output hours for each line, which is good count divided by ideal rate. Add them up and divide by total planned hours. In the example, 151 / 220 = 68.6%.

How do you calculate OEE for multiple machines?

If they run side by side, weight each machine's OEE by its planned time, as this tool does. If they feed each other, treat them as one line and measure at the end. For one step with several machines, see OEE for parallel machines.

How do you calculate overall OEE from three percentages?

You need the planned time behind each one. Multiply each OEE by its planned time, add the results and divide by total planned time. Without the times, you can only get a simple average, which may be off by many points.

Can I use the simple average if all lines run the same hours?

Yes. With equal planned time, the weighted result and the simple average are the same. The tool shows a gap of 0 in that case.

Why does my line show over 100%?

The ideal rate is too low, or the count includes another period. OEE cannot pass 100% with a true ideal rate. See OEE over 100 percent.

What is a good plant OEE?

Targets are set per process, and a plant figure mixes many of them, so compare each line with its own trend. How to set OEE targets walks through the method.

← All OEE Lab tools · How to average OEE across machines →