First time through (FTT) = (units started - units that failed in any way) / units started, where a failure is any scrap, rework, retest or downgrade. Many plants use FTT and first pass yield as the same number, and where they differ, FTT usually counts more kinds of failure and follows the unit along the whole route.
FTT per station, line FTT and the gap to first pass yield, for 1 to 10 stations.
What first time through measures
FTT asks one plain question. Of everything we started, how much went through without anyone having to touch it twice?
A unit that ships in the end can still be an FTT failure. If it was repaired, tested again or sold as a lower grade, the process did not get it right the first time.
The term comes from lean practice, where it shows how much work the plant does twice. Rework stations and second tests use people and machine time, and the hidden factory is the usual name for that extra work.
The formula
Example: a cell starts 1,000 gearbox housings in a week. It scraps 18, reworks 32, sends 14 back for a second leak test that they then pass, and downgrades 6 to a lower-spec order.
That leaves 930 housings that nobody handled twice, so FTT is 93.0%. Each unit counts once, even if it failed twice.
First time through calculator
Enter each station on the route in order. The defaults are the housing cell above and the three-step line further down. Updates as you type.
Count units as they enter the station, and count each unit once, however many times it failed. A pass means no scrap, rework, retest or downgrade.
Retest or downgrade is optional. It is the failed units whose only second touch was a retest or a downgrade. First pass yield, as often used, counts them as passes, so this field gives the FPY comparison. Leave it empty if there were none. FPY is usually read at one step. Line FPY here multiplies the station FPYs, the same way as line FTT.
FTT by station
The working
The multiplication assumes each station's failures stand apart from the others. If you can, also track real serial numbers from start to finish and compare the two results.
First time through vs first pass yield
The two terms are used loosely, and plants draw the line in different places. Our guide on how to calculate first pass yield covers FPY itself, which divides total units minus scrap and rework by total units.
Use the table to see where the common difference sits. Then write your own plant's definition on one page, because the label matters far less than the same rule every week.
| Point | First pass yield, as often used | First time through, as often used |
|---|---|---|
| Failure means | Scrap and rework | Scrap, rework, retest, downgrade, any second touch |
| Measured at | Usually one step or test station | Each step, then across the whole route |
| A retest that passes | Sometimes counted as a pass | Counted as a failure |
| Typical home | Quality and test reports | Lean boards and value stream work |
On the same week, the three common yields give three different answers. The gap between them is the work that a final yield figure hides.
FTT across a whole line
For a route with several steps, multiply the FTT of each step. Example: three steps at 93.0%, 97.0% and 96.0% give 0.930 x 0.970 x 0.960 = 86.6%.
So about 13 units in every 100 fail somewhere on the route, even though no single step looks bad. This is the same math as rolled throughput yield, which covers the method in full.
The multiplication assumes each step's failures stand apart from the others. If you can, also track real serial numbers from start to finish and compare the two results.
What the second touch costs
The percentage alone rarely moves anyone. Turn the failures into hours and they get attention.
Example: each rework takes 12 minutes and each retest takes 5. In the week above that is 32 x 12 = 384 minutes plus 14 x 5 = 70 minutes, or about 7.6 hours of paid work that added nothing.
Add the 18 scrapped housings at material cost, and the full picture sits under cost of poor quality. The first pass yield calculator is a quick way to test a similar set of figures.
How to count it on the floor
Write the list: scrap, rework, retest, downgrade, touch-up. Add anything specific to your product.
Use units entering the step, not units leaving it. Otherwise scrap removes itself from the base.
A red tag, a rework scan or a tally at the station. One mark per unit, however many times it failed.
Show the count on the board, with the top failure reason next to it.
The hard part is the failure nobody records. An operator who fixes a loose clip at the station, without telling anyone, keeps your FTT looking fine.
Make that touch-up easy and blame-free to mark. If marks bring trouble, they will stop, and your number will rise while nothing improves.
How FTT links to OEE
OEE's quality factor is good units divided by total units, and it counts only units right the first time. See how to calculate OEE quality and the definition of a good count.
So at a single step, with matching rules, quality and FTT come out at or near the same figure. Differences usually come from the counting point or from retests that the OEE count treated as good.
The two also answer different questions. OEE quality shows the lost share of one machine's capacity, and line FTT shows how much of your product took a clean path through the plant.
Common mistakes
- Counting at final inspection only. A unit repaired mid-route then looks perfect. Count at each step.
- Counting failures, not units. A unit that fails twice is one lost unit in FTT. Log the second failure separately for your defect list.
- Leaving out retests. A second test that passes still used a test slot, and it may point to a test problem.
- Using output as the base. Good units divided by units leaving ignores what was scrapped along the way.
- Comparing plants with different rules. One site's 96% can be worse than another's 93% if the first ignores touch-ups.
What to do with a low number
Rank failures by step and by reason, then start with the step that fails the most units. A mistake-proofing device or a clear work standard is often the first fix for manual steps.
Retests deserve their own look, since a test station that fails good units creates both lost time and doubt. For the wider plan, see how to reduce scrap and rework.
FTT tells you how much was done twice, and OEE shows the time that cost on each line. Fabrico is a light MES for OEE that shows OEE per line and shift, from live stops, speed and counts. See how Fabrico tracks OEE per line.
What people ask next
Is first time through the same as first pass yield?
Often they are used as the same number. Where a plant separates them, FTT counts more types of failure, including retests and downgrades, and is followed across the route. See how to calculate first pass yield.
Does rework count against first time through?
Yes. A reworked unit may ship, but it did not go through right the first time, so it is a failure in FTT. The same rule applies to the good count in OEE.
What is a good first time through percentage?
The result depends on product, process and how strictly you define failure, so a figure from another plant tells you little. Track your own trend per step, and compare only sites that use the same rules.
How do you calculate first time through for several processes?
Calculate FTT at each step and multiply the results. Three steps at 93%, 97% and 96% give 86.6%, the same method as rolled throughput yield.
What is the difference between first time through and scrap rate?
Scrap rate counts only the units thrown away. FTT also counts units saved by rework or retest, so it is always equal to or lower than one minus the scrap rate.