Scrap Rate & Cost of Poor Quality Calculator
Turn scrap and rework into your scrap rate, first-pass yield, and the real annual euro cost. Numbers update as you type.
Your line
One line or product, for a typical day.
Want a second look at this result?
Leave your work email if you would like the OEE Lab team to get in touch about your numbers. To keep the result, use Copy link or Print above.
No newsletter, no spam.
Most scrap is a handful of repeating causes.
Quality losses pull down the Quality factor of OEE, and the same defect usually repeats until you find its true cause. Fabrico tracks quality losses per machine and shift alongside its stops, live from PLCs or IoT sensors, with add-on AI cameras counting output where a machine has no usable signal and, where cameras are fitted, can stream video of a stop on request next to its machine data, so the defect that keeps coming back gets a cause.
Request a demo Contact usHow to calculate scrap rate, yield and COPQ
- Scrap rate = scrap units ÷ total units produced.
- First pass yield (FPY) = (total - scrap - rework) ÷ total. Rework counts against FPY, even if the unit is eventually sold.
- Cost of poor quality (COPQ) = (scrap units × cost per scrapped unit) + (rework units × rework cost). This is the direct, defensible figure; returns, recalls and lost customers make the true number higher.
Quality is one of the three factors of OEE. See how it fits in Availability vs Performance vs Quality, and which losses it maps to in the six big losses.
Scrap tends to repeat on the same machine for the same few reasons. The guides for the injection moulding, extruder, die casting machine and thermoforming machine list the usual defect causes and fixes. To track the share made right first time, see how to calculate first pass yield.
A worked example: one moulding line, one year
An injection moulding line makes 20,000 parts a day. 500 are scrapped at €1.50 each (material plus processing), 200 are reworked at €0.60 each, and the line runs 250 days a year. These are the numbers already in the calculator above.
- Scrap rate = 500 ÷ 20,000 = 2.5%.
- First pass yield = (20,000 - 500 - 200) ÷ 20,000 = 96.5%.
- Cost of poor quality = (500 × €1.50) + (200 × €0.60) = €750 + €120 = €870 a day, €217,500 a year.
Scrap usually comes from a short list of repeating causes. If one defect is behind half of those 500 scrapped parts, fixing that one cause is worth €93,750 a year (250 × €1.50 × 250 days), before anyone touches the rework.
Scrap also costs machine time
The €1.50 covers material and processing. The second loss is capacity: every bad part took a cycle the line could have spent on a good one. With a 6-second cycle, the 700 parts that were scrapped or reworked used 4,200 seconds: 70 minutes of the line every day, spent making parts nobody can ship first time. That is why OEE counts rework as a quality loss too: the quality factor here is 96.5%, the same as first pass yield, not 97.5% (1 minus the scrap rate).
Common mistakes
- Counting only end-of-line rejects. Start-up scrap after a changeover and parts pulled at upstream stations are scrap too. Start-up rejects are one of the six big losses.
- Leaving rework out because the part ships in the end. It was not right first time, it cost labour, and it used machine time.
- Counting parts when they differ in value. A scrapped housing and a scrapped clip are not the same loss. Use the cost per unit for each product.
- One plant scrap rate per month. It hides the machine, the shift and the product that make most of it. Split it, then rank the causes.
What a lower scrap rate is worth
Overall Equipment Effectiveness (R. C. Hansen, 2001) sizes a waste reduction with plain arithmetic: in his example plant with $25M of materials a year, cutting a 5% waste rate by a tenth (to 4.5%) saves 0.5% of materials, about $125,000 a year, and adds roughly half a point of OEE. His point is that the throughput gain from less scrap usually matters more than the material saved, because the machine time is freed for good product. Run your own numbers above, then see the time side with the OEE calculator.
How do you calculate scrap rate?
Divide scrapped units by total units produced in the same period. 500 scrapped parts out of 20,000 is a scrap rate of 2.5%.
What is the difference between scrap rate and first pass yield?
Scrap rate counts only the parts thrown away. First pass yield counts the parts that were right first time, so reworked parts lower it as well. With 2.5% scrap and 1.0% rework, first pass yield is 96.5%.
Should rework count as a quality loss?
Yes. A unit that needs rework was not made right the first time, so it lowers first pass yield and adds cost, even if it is eventually shipped.
What is a good scrap rate?
It is highly industry- and process-specific. The useful target is your own trend heading down; in the world-class OEE figures, quality (good parts first time over all parts) is 99% (traced to Nakajima, Introduction to TPM, 1988).
How do I reduce it?
Find the recurring defect modes and their true cause with SPC and root-cause analysis, then control the process. More on root cause analysis.