Blog / Performance
Performance · Guide

V-Graph: Setting Speeds Around the Key Machine

OL By OEE Lab Editorial |Updated 2 November 2026 |6 min read
Short answer

A V-graph, also called a V-curve, plots each machine's top speed in line order. The key machine, often the filler on a bottling line, sits lowest and the others get faster the further they are from it, which draws a V. In steady running the line holds the key machine's pace, and the spare speed lets neighbors catch up after a stop so buffers recover and the key machine keeps running.

The idea in one picture

Example: a bottling line with six machines, and a filler rated at 600 bottles a minute as the key machine. All the numbers on this page are hypothetical.

720 660 600 660 720 780 Dep Rin Fill Lab Case Pal
Top speed in bottles per minute, in line order: depalletizer, rinser, filler, labeller, case packer, palletizer. The speed axis does not start at zero.

The V shows what each machine can do, not what it does all day. In steady running the line holds the filler's 600 a minute, and faster machines slow down or pause when their buffer is full or empty.

So the line's output is set by the key machine. Everything else is there to keep that machine running without a break.

Why the neighbors must be faster

Machines stop, and a buffer between them absorbs a short stop. The catch is that a buffer used up in a stop has to be restored afterwards.

  • Upstream of the key machine: when the rinser stops, the filler drinks from the buffer. After the restart, the rinser must run faster than the filler to refill it.
  • Downstream of the key machine: when the labeller stops, bottles pile up in the buffer. After the restart, the labeller must run faster than the filler to clear it.

If a neighbor ran at exactly the filler's speed, a used buffer would never recover. The next stop would then reach the filler straight away.

Machines further out get more margin, since after a stop they have to keep up with a neighbor that is itself running fast to catch up.

Which machine is the key machine

It is the one you most want running without interruption. On packaging lines that is often the machine that is hardest to stop and restart, costliest to run below its rate, or most sensitive for product quality.

On a beverage or food line that is often the filler, because a stop there can waste product. On other lines it may be something else, so decide it on purpose.

Check it against bottleneck analysis. A V-graph says the chosen key machine should be the constraint, and the floor may disagree.

Test the margin with two formulas

A V on paper proves little. Two small sums tell you what a given speed margin actually buys.

Catch-up time = stop min x key rate / (machine rate - key rate)
2 x 600 / (660 - 600) = 20 min
Minimum uptime = key rate / machine rate
600 / 660 = 90.9%
Worked for the labeller: 660 a minute next to a 600 a minute filler, after a 2-minute stop.

The first answer is how long the buffer needs to recover. If the labeller stops again before those 20 minutes are up, the buffer never gets back to where it was.

The second answer is a hard floor. If the labeller is down more than 9.1% of the time, it cannot keep up with the filler at any buffer size.

Machine rateMargin over fillerCatch-up after a 2-min stopMinimum uptime
630 / min30 / min40 min95.2%
660 / min60 / min20 min90.9%
720 / min120 / min10 min83.3%
780 / min180 / min6.7 min76.9%
A small margin recovers slowly and tolerates few stops. Doubling the margin halves the catch-up time.

Compare the table with your own stop data, using mean time between stops for each machine. A machine that stops every 15 minutes needs a catch-up time well under 15.

Buffers and the V work as a pair

A buffer sets how long a stop it can hide, and the speed margin sets how fast it comes back. One without the other does little.

Example: 1,800 bottles of free buffer room next to the filler hide a labeller stop of 1,800 / 600 = 3 minutes. A 4-minute stop reaches the filler, whatever the margin.

When stops pass from machine to machine, the signs are blocked and starved time. Upstream and downstream stops shows how to assign them to the machine that caused them.

How to draw the V-graph for your line

1
List the machines in flow order
Include every machine that can stop the flow.
2
Convert to one unit
Bottles per minute, not cases or layers. Example: 60 cases a minute of 12 is 720 bottles.
3
Mark the key machine
Write down why you chose it.
4
Use two rates
Rated speed from the supplier, and what the machine sustains today.
5
Plot both lines
Machine on the bottom axis, speed on the side.
6
Look for breaks in the V
Flat spots, bumps and a low point in the wrong place.
One V-graph per product format, because rates change with format.

The gap between the two lines is often the useful part. A machine may no longer hold the speed the line was designed around, and causes of reduced speed helps explain why.

Reading what you find

  • A machine slower than the key machine. It is the real constraint, and the line runs at its pace. Fix it, or accept it as the key machine.
  • A flat stretch. Two neighbors at the same speed cannot recover a buffer between them.
  • A machine much faster than its neighbors. It may be stopping and starting all day, waiting for product. Slowing it to a steady pace can reduce jams.
  • The low point moves by format. A new size can make a different machine the limit, so check each format.

What we cannot tell you

We found no neutral figure for how big each speed step should be. The 10% steps in our example are only an illustration, so test your own steps on the line.

Treat the steps on this page as an illustration. For a line under design, ask your line builder for the reasoning and test the numbers against your own stop data.

How it differs from line balancing

Line balancing tries to even out work between stations, which suits manual assembly. A V-graph does the opposite, leaving most machines with spare speed on purpose.

Those are not rival ideas. They answer different questions, about different kinds of line.

What it means for your OEE numbers

Measure line OEE on good units out of the end of the line, against the key machine's ideal rate. Then spare speed elsewhere on the line does not count against you.

Scoring the palletizer alone against its 780 would show at most 600 / 780 = 76.9% performance on a perfect day. That number tells you nothing, as line OEE vs machine OEE explains.

See it live in Fabrico

A V-graph is only as good as the rates you put on it. Fabrico takes stops, speed and counts live from PLCs or IoT sensors on each machine, including older ones, so the rates on your chart can come from the machines instead of the design drawing. See how Fabrico connects line machines.

What people ask next

Why is it called a V-graph?

Plot top speed against machine position, and the lowest speed sits at the key machine with the others rising on both sides. The line on the chart looks like a V. If the key machine sits at one end of the line, you may see only half of it.

Should the key machine be the slowest machine?

On a line designed this way, yes, it is set slowest on purpose. If another machine is slower in practice, then that machine is the true limit. Use bottleneck analysis to confirm which one it is.

How much faster should each machine be?

We found no neutral rule of thumb we could stand behind, and it depends on the stop pattern and the buffer. Use the catch-up and minimum uptime sums above with your own stop data.

Does a V-graph apply outside packaging?

The logic holds wherever machines in series have buffers between them and one machine matters most. It is mostly discussed for high-speed packaging lines. For discrete lines, also see OEE on parallel machines if one step has several machines.

Where do I find the true speed of each machine?

Time each machine across long stretches of steady running, and do not read it off a stopped panel. A PLC signal or a retrofit counter makes this easier. See PLC signals for OEE and retrofit sensors.

See OEE per line and shift on your own machines

Fabrico is a light MES for OEE. It takes stops, speed and counts from PLCs or IoT sensors, with add-on AI cameras counting output where a machine has no usable signal, and operators tag the cause at the line.

Book a Fabrico demo

Related guides: Conveyor Short Stops: Jams, Tipping and Gaps · OEE for Beverage Lines: Filler First, Then Why

← More OEE Lab guides · Bottleneck analysis →

OEE essentials: OEE calculator · What is OEE · Six big losses · Availability · TEEP · Cost of downtime · OEE benchmark · Free OEE tracker · Free OEE software · How to track downtime · How to implement OEE · Light MES vs full MES