Run a Shift
Hit 34,000 good bottles by 14:00. Every call you make shows up on the line.

Free · no sign-up · scores stay on this device
good bottles 06:00

On a real line, Fabrico builds this report for you. Stops come from the machine signal, operators pick the reason, and a camera counts output where a machine has no usable signal. See how Fabrico tracks a real shift
Your best shifts
Scores stay on this device. No sign-up, no email, nothing to share unless you choose to.
What's going on in the game
The line is rated at 100 bottles a minute. Every bottle it does not make, or makes and scraps, lands in one of the six big losses. Breakdowns and setups and adjustments stop the line and cut availability. Small stops and reduced speed keep it running below its best and cut performance. Start-up rejects and production rejects scrap bottles and cut quality.
The score is plain OEE: availability × performance × quality, which is the same as good bottles divided by what the line could make in the planned time. The 30-minute break is a planned stop, so it does not count. Stops shorter than a minute are booked as small stops, under performance.
Want to run your own line's numbers through the same maths? Try the six big losses calculator or the OEE calculator.