For an injection molding press, count parts, not shots: shots times active cavities. The ideal cycle belongs to the mold, so use its best proven cycle. Mold changes and waiting are stops, slow cycles and blocked cavities are speed loss, and start-up scrap is a quality loss.
What is different about a molding press
An injection molding press makes parts in shots. Each shot fills a mold with one or more cavities. So the unit of work is the shot, but the unit of output is the part.
That gives injection molding three special points for OEE.
The ideal cycle belongs to the mold, not the machine. The output is shots × cavities. And a lot of loss hides in the cycle itself, because the cycle drifts by a second here and there.
For the typical losses by sector, see OEE and downtime in plastics. For faults and fixes on the press, see injection moulding troubleshooting. This page shows how to calculate the OEE.
The three factors for a press
| Factor | What to count | On a molding press |
|---|---|---|
| Availability | Run time ÷ scheduled time | Mold changes, waiting for material or a drier, mold faults and hot runner faults are stops. |
| Performance | Ideal cycle × shots ÷ run time (cavities counted) | Slow cycles, cavities blocked off, and short stops nobody logs all show here. |
| Quality | Good parts ÷ parts made | Start-up scrap, short shots, flash and QC rejects count against it. |
The three factors for an injection molding press.
The anatomy of a cycle
The cycle has a few steps: the mold closes, plastic is injected, pressure is held, the part cools, the mold opens and the part is ejected. Cooling is often the longest step, but check on your own mold.
- Close and inject4 s
- Hold3 s
- Cool10 s
- Open and eject3 s
The ideal cycle is the shortest cycle that gives good parts with that mold, on that material. Take it from a proven run, not from the mold maker's quote. Keep it fixed for the mold, and change it only when you accredit a faster cycle. See ideal cycle time.
Count parts, not shots
Use one unit throughout. If you count shots on the press and parts at packing, you will get two different OEE numbers. The usual choice is parts.
Ideal part rate = cavities ÷ ideal cycle time
What if a cavity is blocked off because of damage? Keep the ideal rate at the full cavity count. The missing parts then show up as lost performance, which is correct, because the mold could have made more. If you lower the ideal rate to match, the loss disappears from the report.
This follows Overall Equipment Effectiveness (R. C. Hansen, 2001): keep the family ideal rate and note the reduction, so that difficult or damaged tooling is visible.
Worked example: one press, one shift
Example: a press runs a 4-cavity mold with an ideal cycle of 20 seconds. That is 4 parts per 20 seconds, or 12 parts a minute. Scheduled time is 450 minutes.
| Stop | Minutes |
|---|---|
| Mold change | 45 |
| Waiting for dried material | 15 |
| Hot runner zone fault | 20 |
| Logged short stops (door, ejection, purging) | 10 |
| Total stops | 90 |
| Run time (450 - 90) | 360 |
Example stop log, hypothetical numbers.
In the 360 minutes the press made 1,030 shots, which is 4,120 parts. Start-up scrap was 80 parts and QC rejected 40 more. Good parts: 4,120 - 120 = 4,000.
| Factor | Calculation | Result |
|---|---|---|
| Availability | 360 ÷ 450 | 80.0% |
| Performance | 4,120 ÷ 12 = 343.3 min of ideal time ÷ 360 | 95.4% |
| Quality | 4,000 ÷ 4,120 | 97.1% |
| OEE | 0.800 × 0.954 × 0.971 | 74.1% |
| Check with 3 numbers | 4,000 ÷ 12 = 333.3 min ÷ 450 | 74.1% |
Both routes give the same answer.
- OEE (good parts)74.1%
- Stops20.0%
- Slow cycles3.7%
- Start-up scrap and rejects2.2%
Check the stops split: the mold change alone is 45 ÷ 450 = 10.0% of scheduled time, half of the total stop loss. That is the target for a changeover project. See SMED.
The average cycle was 360 × 60 ÷ 1,030 = 21.0 seconds against the ideal 20. One second a shot sounds small.
But over 1,030 shots the press used 21,600 seconds where 20,600 would do. That is 1,000 seconds, or 16.7 minutes: the same 3.7% speed loss, seen from the cycle side.
Where cycle drift comes from
When the actual cycle is longer than the ideal cycle, look for the cause in the step that grew. Some places to check:
- Cooling. Mold temperature or water flow drifting. See mould temperature controller troubleshooting.
- Plastication. Screw recovery time, back pressure, material moisture. See resin dryer troubleshooting.
- Hot runner. Zones out of range that make the operator wait. See hot runner controller troubleshooting.
- Handling. A robot or an operator who is late to take the part, or a safety door opened mid-cycle.
Record the cycle time of every shot, if you can, and chart it. A line that drifts up slowly is easy to miss in a shift report and easy to see on a chart. This is the same hidden loss as micro-stops.
What counts as scrap
- Start-up parts. Count them as quality loss. It is the "reduced yield" loss, and it shows how much each start costs.
- Purge. Purged material is not a part. Track it as material cost, not as an OEE loss, unless you also count purge shots.
- Sprues and runners. They are not parts. If you regrind and reuse them, they do not enter the OEE. Material cost is a separate measure.
- QC rejects found later. Hansen puts product that is transferred and later found bad into waste, with the cause noted.
See how to calculate scrap rate if you want the cost view as well.
Targets
Hansen sets world-class bars by process type, building on Nakajima's TPM figures: 85% or more for batch and discrete processes, and 90% or more for dedicated discrete. A press on a stable, long-running job comes close to a dedicated discrete process. A press with frequent mold changes is closer to batch. Choose the bar that fits and compare your own trend first. See how to set OEE targets.
Cycle drift hides in shift totals. Fabrico reads stops, speed and counts live from PLCs or IoT sensors, and operators tag the cause at the press, so mold changes, waiting and slow cycles show up as separate losses in OEE per line and shift. See machine connectivity for OEE.
What people ask next
Should I count shots or parts for OEE?
Parts. Shots times active cavities gives the part count, and parts are what the customer buys. Using shots hides a blocked cavity, which is a real loss.
How do I treat a blocked cavity?
Keep the ideal rate at the full cavity count. The parts you do not make show up as a performance loss, so the damaged mold stays visible in the data.
Does a mold change count as downtime?
Yes, as a planned stop. It still reduces availability, because the press could have made parts. Hansen classes changeovers as planned stops that are part of normal operation. Measuring and cutting them is a big lever. See how to measure changeover time.
How do I set the ideal cycle time for a mold?
Use the shortest cycle proven in production with good parts for that mold and material. Do not use the quote or the average. Re-accredit it when you make a real improvement.
How do I find cycle time loss?
Chart the actual cycle of every shot against the ideal, and look at which step grew. Small increases over many shots are the usual pattern, so a chart works better than a total. See speed losses.