Short answer

Build one dashboard per audience. The operator needs a line board: state, count against plan and the current stop. The supervisor needs the shift view with the top stops. The manager needs trends and a Pareto. Always show OEE with its three factors and the top losses, never OEE alone.

One dashboard per audience

A dashboard that tries to serve everyone serves no one. The operator on the line, the supervisor and the plant manager ask different questions.

Build one view for each.

AudienceQuestionTime windowBest layout
OperatorAre we on target this hour, and what is stopped now?Now and this shiftLine board
SupervisorHow did the shift go and what hurt most?Shift and dayShift view with Pareto
ManagerAre we getting better, and where?Week and monthTrend and comparison

Example 1: the line board

This is the screen at the machine. It must be readable from a few meters, so it shows few things: state, count against plan, and the current stop with a timer.

State
STOPPED
Label misfeed, 3:12
This hour
640 / 1,200
53% of plan
Shift OEE so far
68%
A 91 / P 78 / Q 96
A line board in three tiles. The stopped state is red and the cause and timer are on the same tile.

Notice the third tile. It shows OEE and its three factors together.

A single OEE number says little. The factors say where to look. See availability, performance and quality.

Example 2: hour by hour

The hour-by-hour board compares output with plan for each hour of the shift. It is the best way to see when the day went wrong.

Example: the plan is 1,200 pieces an hour. Bars turn amber below 95% of plan and red below 80%.

06:001,180 (98%)
07:001,090 (91%)
08:00640 (53%)
09:001,150 (96%)
10:001,210 (101%)
11:00980 (82%)
12:001,100 (92%)
13:001,160 (97%)
Output against a plan of 1,200 an hour. The 08:00 hour stands out at once.
Total: 8,510 pieces against a plan of 8 x 1,200 = 9,600
Attainment: 8,510 / 9,600 = 88.6%
Biggest gap: 08:00, 560 pieces short of plan
This is attainment against plan, not OEE. It is a fast daily check, and the stop at 08:00 is where to dig.

The next step is to link the red hour to its stop. See hour-by-hour production board for how to run it.

Example 3: the downtime Pareto

A Pareto chart ranks stop causes by total minutes. It shows the few causes that cause most of the loss.

Changeover (2 stops)95 min
Label misfeed (52 stops)58 min
Waiting for material (4 stops)40 min
Labeller drive fault (1 stop)35 min
All other causes (9 stops)25 min
Stop minutes by cause in one shift, with the number of stops. Changeover is largest, but label misfeed stops 26 times as often.

Always show the count of stops next to the minutes, as above. 58 minutes from 52 short misfeeds needs a different fix from one long breakdown. Read how to build a downtime Pareto chart.

Example 4: the weekly trend

For managers, the question is direction. A line chart of OEE by week, with the three factors beneath it, shows whether the work is paying off.

Always mark the changes you made, such as a new feeder or a new reason list, so the trend has a story.

Example: four weeks on one line, with the change marked in the week it happened.

WeekAPQOEENote
4080%82%96%63.0%
4181%83%96%64.5%
4284%84%96%67.7%New label feeder fitted
4386%86%97%71.7%

The marked week explains the step up. Without the note, a manager would see 63% to 72% and not know which change to copy to the next line.

Weight weeks by scheduled time when you average them, as Overall Equipment Effectiveness (R. C. Hansen, 2001) advises, so a short week does not count the same as a full one.

Example 5: the shift view

The supervisor view lists each line with its OEE and factors, the top three stops of the shift, and the open actions from yesterday. It supports the daily meeting. See daily production meeting.

LineOEEA / P / QTop stopOpen action
Line 171.8%88 / 85 / 96Label misfeed, 41 minReset label sensor gap
Line 269.7%79 / 90 / 98Changeover, 55 minChangeover review Thursday
Line 369.2%91 / 80 / 95Slow running at the capperCheck capper speed setpoint

Three lines with almost the same OEE, and three different problems. That is why the factors sit next to the number.

Example 6: the plant comparison

A table of lines side by side is tempting, and risky. A line that runs short, hard products looks worse than one that runs long, easy ones.

Compare each line with its own past, and with a target per product family, not with each other. See line OEE vs machine OEE.

Common mistakes

  • OEE as a single big number. It hides which factor is weak. Always show A, P and Q.
  • Averages across products. A plain average of lines or shifts misleads. Weight by scheduled time.
  • Charts with no action. If a tile never changes a decision, remove it.
  • Fancy 3D and gauges. They look good in a demo and read badly on the floor. Bars and numbers win.
  • Stale data. A board that shows yesterday as if it were now is worse than no board.
  • No owner for the board. Name one person who keeps it right and one who acts on it.

How to start

1
Pick one audience
Start with the line board for one line. Ask the operators what they want to see.
2
Choose five or fewer tiles
State, count against plan, current stop, shift OEE with factors, top stop so far.
3
Set targets
A target per product family. Use your own best accredited rate, not a guess. See ideal cycle time.
4
Run it for two weeks
Review with the crew every day. Remove what nobody uses.
5
Add the next view
Then the shift view, then the weekly trend.
A five step plan for the first dashboard.

Design rules that hold up

  • Show the target next to the number. A number with no target is trivia.
  • Never rely on color alone. Add a word or an icon. Some people cannot tell red from green.
  • Big text for the floor. If it cannot be read from the walkway, remove tiles until it can.
  • Five tiles at most per screen. Each must lead to an action.
  • Show losses, not just OEE. The top three stops are worth more than the third decimal of OEE. See the six big losses.
  • Use one definition everywhere. If two screens give two OEE numbers for the same shift, nobody trusts either.

If you want to build your own, start with free OEE dashboard software or compare tools in best manufacturing KPI dashboard software.

See it live in Fabrico

Fabrico is a light MES for OEE. It shows OEE per line and shift, with stops, speed and counts live from the machines and the cause tagged by operators at the line. See OEE per line and shift in Fabrico.

What people ask next

What should an OEE dashboard show?

OEE with availability, performance and quality, the top stop causes, output against plan, and the current state. Each tile should lead to an action.

How many metrics are too many?

More than about five tiles on one screen. If the floor cannot read it from the walkway, there are too many. Move the rest to a second view.

Should I compare lines on one dashboard?

Carefully. Different products and speeds make raw comparison unfair. Compare each line with its own history and target. See how to average OEE across machines.

How often should the dashboard update?

Often enough to act in the shift. For a line board, every few seconds to a minute is typical. For a weekly trend, once a day is enough.

Can I build one in a spreadsheet?

Yes, for a start. The limit is data entry, which is late and rounded. See the OEE tracking template and the OEE tracker.