OEE Lab / Six Big Losses Calculator

Where is your OEE actually going?

Every point of OEE you lose falls into one of the Six Big Losses: two that stop the line, two that slow it, two that scrap what it makes. Enter the minutes each one cost this run and watch your planned time flow down the waterfall to what was truly productive, with the availability, performance and quality split alongside. Numbers update as you type.

Your losses this run

Enter the minutes lost to each loss over one planned run or shift. Reduced speed and rejects go in as the equivalent minutes of lost output (units missed times ideal cycle time).

min
Time the line was scheduled to run this shift, after planned breaks.

Availability losses the line is stopped

min
Unplanned stops and equipment failures.
min
Changeovers, tooling swaps, first-part adjustments.

Performance losses the line runs, but under rate

min
Minor stoppages, jams, misfeeds, idling under 5 min.
min
Output lost to running below ideal cycle time.

Quality losses output you cannot sell

min
Scrap during warm-up and first runs after a stop.
min
Scrap and rework during steady-state running.
Your OEE this run
-
World-class OEE is around 85%. This is where your planned time actually ended up.
040%60%85%100%
Availability
-
Performance
-
Quality
-
Fully productive
-

Where your time goes

Your losses appear here, ranked biggest first.

Get the one-page loss breakdown for your line

We'll email a clean breakdown of this result plus the 2026 Manufacturing Benchmark Report, typical OEE and loss mix by industry. One email, no spam.

Done - check your inbox shortly.

No spam. Unsubscribe anytime.

You can only cut the losses you can see.

Most of this chart is an estimate until something at the line is actually counting. The free OEE Tracker logs every stop and slow run as it happens, so the six losses stop being a guess and the biggest one becomes obvious.

Open the free OEE Tracker
Free, and your data stays yours.

The two losses your logs will never show you.

Small stops and slow cycles do not raise a ticket, so they stay invisible on any manual or CMMS-based record. Fabrico uses computer vision to catch every micro-stop and slow cycle at the machine and name its true cause, then closes the loop from that PLC-read signal to an auto-routed work order. The performance losses above stop being a mystery and start getting fixed.

Book a Fabrico demo
Our tools stay free either way.

The Six Big Losses, and why two of them hide

The Six Big Losses are the standard way to account for every minute that pulls OEE below a perfect 100 percent. They sort into the three factors of OEE. Breakdowns and setup and adjustments are availability losses: the line is stopped and everyone can see it. Small stops and reduced speed are performance losses: the line is running, just not at rate. Startup rejects and production rejects are quality losses: the line made output you cannot sell. The two availability losses are visible because a stopped line gets noticed. The two performance losses are the dangerous ones, because a line that quietly runs under rate looks fine from across the floor and never generates a record.

The math

Start with planned production time. Subtract the availability losses to get operating time, and Availability is operating time divided by planned time. Subtract the performance losses from operating time to get net run time, and Performance is net run time divided by operating time. Subtract the quality losses to get fully productive time, and Quality is fully productive time divided by net run time. OEE is Availability times Performance times Quality, which is the same as fully productive time divided by planned production time. Every loss you enter above is one step down that waterfall.

How do I put reduced speed and rejects into minutes?

For reduced speed, take the units you missed by running under the ideal cycle time and multiply by the ideal cycle time, that is the minutes of output you lost. For rejects, multiply the reject count by the ideal cycle time, since a rejected part cost the time to make it. Entering all six losses in the same unit, minutes, is what lets them add up into one honest waterfall.

Which of the six usually costs the most?

On most lines it is the performance pair, small stops and reduced speed, precisely because they are not tracked. Breakdowns get a ticket and setups get a plan, so they are managed. A machine idling twenty seconds at a time, all shift, is nobody's job to notice, and it can quietly out-cost every breakdown on the board.

How do we actually find the hidden losses?

You measure at the machine instead of on paper. The free OEE Tracker logs stops and slow runs as they happen, and Fabrico goes further with computer vision that catches every micro-stop and names its true cause, then routes the fix automatically. The OEE calculator and the availability, performance and quality guide show how the same numbers roll up.